EZ Sign Permit

The Reach Lofts sign in Fishtown — an example of a sign that could be permitted by an EZ Sign Permit.

The City of Philadelphia can be a cruel mistress.  When filing permits, it’s common to be told that the thing you’ve done 176 times needs to be laid out a different way the 177th time – but then, on the 178th time, to go back to the regular way.  Sometimes, the way the application process works depends on which staffer is on lunch.  This is life on the mean streets of 1401 JFK Boulevard.

But every now and again, the City smiles upon us all, and cuts away some of its own red tape.  It has recently cut some tape around its troubled sign permits by creating what we in the permit game have previously only dreamt of: EZ sign permits.

Continue reading “EZ Sign Permit”

Philadelphia EZ Permits

Philadelphia EZ Permits can be used to renovate single-family homes like these

The City of Philadelphia offers a type of building, electrical, and plumbing permit called an EZ Permit.  This is because it’s easier to get than a normal permit (don’t look at me like that – I’m not in charge of naming this stuff).  Philadelphia EZ Permits are the source of a lot of hope and a lot of confusion for homeowners and developers.  In this post, we’re going to try to clear some of the mud off the Philadelphia EZ Permit.

Continue reading “Philadelphia EZ Permits”

©, Permit Philly LLC.